Serving San Juan · Caguas · Bayamón · Ponce · Mayagüez · Humacao
Commercial Solar and Battery Storage for Puerto Rico
Stop paying 30¢+ per kWh for a grid that still goes dark. AGT builds hurricane-rated solar and battery systems that keep manufacturing lines, hospitals and hotels running through LUMA outages, with U.S.-listed equipment, U.S. contracting standards and a team 1,000 miles away in Florida.
- Solar + BESS sized to carry your critical loads through island-wide events
- Engineered to Florida's High-Velocity Hurricane Zone standards, built for Maria-class storms
- Net metering credit for exports under Puerto Rico's net metering law
- U.S. licensed EPC, UL-listed equipment, NEC-compliant design, Jones Act shipping managed
Ranked #1 commercial solar EPC in Florida by Solar Power World. 100% employee-owned.
Get a Free Puerto Rico Project Estimate
A solar and storage engineer replies within one business day. No obligation.
Why Puerto Rico operators are moving now
Three problems, one system
Puerto Rico’s manufacturers and institutions run some of the most demanding facilities in the Caribbean on one of its least reliable grids. The pattern is familiar to anyone operating on the island.
The grid is the single point of failure
Island-wide blackouts, rolling load-shed events and aging oil-fired generation mean every facility already owns generators. Batteries respond in milliseconds and cover the gap before the generator takes load, so sensitive processes never see the outage.
Rates keep climbing
Base-rate increases plus quarterly fuel adjustments make long-term budgeting impossible. On-site solar fixes the cost of a large share of your consumption for the life of the system.
Resilience is now a compliance and customer requirement
Pharma and medical-device plants, hospitals and cold-chain operators are being asked by regulators, insurers and customers to prove continuity. Solar plus storage with documented runtime is the answer they accept.
What you’re paying today. Puerto Rico’s commercial tariff carries quarterly fuel and purchased-power adjustments. Residential rates set a record above 33¢ per kWh in late 2025, and PREB is reviewing permanent base-rate increases for fiscal 2027. Figures are from public utility and regulator sources; we verify your actual tariff from your bills.
Interactive estimator
Size a solar + battery system for your facility
A first-pass estimate from your monthly LUMA bill. It tells you roughly how much solar fits, how large a battery you need to carry critical loads through an outage, and what that offsets. Our engineers refine it with your interval data.
Your facility
All fields are editable, including the rate.
First-pass system
Estimates only. Assumes about 1,500 kWh per kW per year of production, 95 sq ft per kW of roof area, 90% usable battery capacity and a 30% peak factor. Final sizing depends on your interval data, roof structure, utility tariff and interconnection limits.
Who we build for in Puerto Rico
Built for facilities where downtime has a price
Commercial and industrial properties with a meaningful energy bill and loads that can’t wait for the grid to come back.
Pharmaceutical & medical-device manufacturing
Validated environments where a voltage dip is a batch loss. Battery-first ride-through, then solar offset.
Food, beverage & consumer manufacturing
Multi-shift plants in Caguas, Bayamón, Ponce and the industrial parks across the island.
Hospitals & healthcare campuses
Critical loads beyond the life-safety generator: imaging, pharmacy refrigeration, HVAC for patient areas.
Hotels & resorts
San Juan, Dorado, Río Grande and the west coast. Large daytime loads and guests who expect the lights to stay on.
Cold storage, grocery & distribution
Where every outage is inventory written off and trucks sitting at the dock.
Shopping centers & office campuses
Carport solar over parking, batteries for the anchor tenants' critical circuits.
Scope of work
One contractor from engineering to energization
AGT is a turnkey EPC with in-house engineering, electrical, roofing, crane and logistics divisions. There is no hand-off between a designer, an installer and an electrician — and no one to point fingers at when the storm comes.
Rooftop, carport and ground-mount solar
Designed to the wind loads your island actually sees, with attachment and ballast engineering, not catalog assumptions.
Battery energy storage (BESS)
Sized for your critical loads: from hours of outage ride-through to full microgrid operation for days at a time.
Microgrid controls & generator integration
Solar and batteries carry the base load; your existing generators become the backup to the backup and burn far less fuel.
Puerto Rico logistics
Equipment moves on U.S.-flag vessels from Florida to San Juan with Jones Act requirements built into the schedule. Our crews work alongside licensed Puerto Rico electrical partners.
Roof condition & re-roof coordination
Our sister company Advanced Roofing can assess, repair or replace the roof before the array goes on, so you never pull panels off early.
Interconnection, permitting & utility paperwork
We manage the application, studies and inspections with the utility and local authorities from start to energization.
Operations & maintenance
Monitoring, preventive maintenance and storm-response service plans with a 24/7 remote team.
How the work runs
From your utility bill to a commissioned system
Projects in Puerto Rico are managed from AGT’s Fort Lauderdale headquarters, a two-and-a-half-hour flight from San Juan.
Remote assessment
Send us 12 months of utility bills, roof or site plans and your outage history. We model loads, backup needs and a first-pass system size from Fort Lauderdale before anyone gets on a plane.
Site visit & engineering
Our engineers and drone survey team visit the property, verify the roof structure, electrical service and interconnection point, and return a stamped design with a fixed scope and price.
Procurement & logistics
Hurricane-rated modules, racking, inverters and batteries are staged and containerized in South Florida, then shipped with the customs and import paperwork handled.
Install, commission, monitor
AGT crews lead the installation with vetted local trade partners, commission the system with the utility, and monitor performance and battery health from our Florida operations center.
Proof from hurricane country
Built in Florida’s High-Velocity Hurricane Zone. Ready for Puerto Rico.
Every system AGT builds in South Florida is engineered and permitted to the same wind standards your property needs. These are a few of the 450+ MW we’ve delivered.

COSTEX Tractor Parts
Doral (Miami), FL · 1.6 MW rooftopHeavy-equipment parts distributor. One of the largest private rooftop arrays in South Florida, built on an occupied distribution center.

Orange County Convention Center
Orlando, FL · 2.3 MW rooftopRe-roof and solar upgrade delivered together with Advanced Roofing on a live, high-traffic public facility.

North Dade Regional Library
Miami-Dade, FL · 475 kW rooftopPublic building in Miami-Dade's High-Velocity Hurricane Zone, engineered and permitted to the strictest wind code in the U.S.

Frontline Insurance
Lake Mary, FL · solar carport, net-zero35,775 sq ft carport producing roughly 986 MWh a year and taking the headquarters to net-zero.
An honest, reliable, problem-solving solar EPC. Delivered 4.7 MW across eight commercial rooftop projects for us.
James M. Rice, CEO, Nautilus Solar EnergyFull re-roof and a 90 kW solar system on our 20,000 sq ft facility — on time and on budget, working through every obstacle.
Benjamin Koppenhoefer, President, Elite Marine A/CQuestions from Puerto Rico operators
Frequently asked questions
Does Puerto Rico still have net metering for commercial systems?
Yes. Net metering has been in place since Act 114-2007, Act 17-2019 set the island’s renewable targets, and Act 10-2024 deferred any changes to the program until at least 2030. Roughly 4,500 commercial and 60 industrial customers are already interconnected. We manage the LUMA interconnection application and studies as part of the project.
How much backup can batteries realistically provide?
That depends on which loads you call critical. A typical design carries process-critical and refrigeration loads for 4–12 hours on battery alone, with solar recharging during the day and your generator covering multi-day events at a fraction of its current fuel burn. Use the estimator on this page for a first pass, then we model it with your interval data.
Is the equipment built for Maria-class hurricanes?
AGT designs to the wind speeds required in Miami-Dade’s High-Velocity Hurricane Zone, the strictest wind code in the U.S., with engineered attachments and ballast. Battery and inverter enclosures are rated for the environment and installed above flood elevation, and we hand over a pre-storm shutdown and restart procedure.
Which incentives apply to a commercial project in Puerto Rico?
It depends on your entity’s tax position and location. We review federal and Puerto Rico incentives, accelerated depreciation and available financing structures (cash, loan, lease or PPA) with your finance team and show the project both ways in the proposal.
How long does a project take?
A remote assessment and budget takes about two weeks. From signed contract to energization, a commercial solar and battery project typically runs five to nine months depending on equipment lead times, shipping and LUMA’s interconnection process.
Who maintains the system?
AGT monitors every system we build from our Florida operations center. Scheduled maintenance and storm response are delivered by our crews and vetted Puerto Rico partners under a service agreement.
Get started
Get a free Puerto Rico solar and storage estimate
- Call
- (888) 735-2641
- Hours
- Monday–Friday, 8:00 am–5:00 pm Eastern
- HQ
- Advanced Green Technologies
1950 NW 22nd St., Suite A
Fort Lauderdale, FL 33311 - Region
- Projects in Puerto Rico are managed from AGT's Fort Lauderdale headquarters, a two-and-a-half-hour flight from San Juan.
Founded 2007 as the solar division of Advanced Roofing, Inc. 100% employee-owned.
What happens after you submit
- A solar and storage engineer calls or emails within one business day.
- We ask for 12 months of utility bills and any roof or site plans you have.
- You get a remote assessment with a first-pass system size and budget range in about two weeks.
Get a Free Puerto Rico Project Estimate
A solar and storage engineer replies within one business day. No obligation.
